Offline mode — all calculators still work · Morningstar Electric LLC
Morningstar Electric LLC ★
Generator Hookup Sizing
⌂ Home

Generator Hookup Sizing

Add up running watts, then add the single largest starting surge (motors start one at a time). Edit any wattage to match nameplates.

OnLoadQtyRun WStart W

Inlet, cord & breaker

Generator outletMax power @240 VInletCordBackfed breaker
L14-30R7,200 W30 A L14-30P inlet10 AWG 4-wire SOOW/STW30 A 2-pole
14-50R / CS636412,000 W50 A CS6365 / SS2-50 inlet6 AWG (8 AWG listed cords common — check)50 A 2-pole
Interlock vs transfer switch. A listed interlock kit (made for that panel brand/model) mechanically prevents the main and generator breakers from being on together; the whole panel is available and you load-manage by hand. A manual transfer switch moves pre-selected circuits only. A standby generator needs an ATS — service-rated if ahead of the main — and the generator must be sized for the transferred load per 702.4(B) (or use load management). Backfed breakers need a hold-down (408.36(D)). Generator conductors to the first OCPD: ≥115% of nameplate current (445.13). Check the bonded/floating neutral: with a 3-pole-neutral-not-switched setup, portable generators used with an interlock typically need a floating neutral. Most jurisdictions require a permit for interlock/inlet and standby generator installs.
Morningstar Electric LLC is a dealer for DuroMax portable/dual-fuel generators and EG4 inverters and batteries. Always size to the specific model's continuous (rated) output, not peak, and follow its manual.
Reference only — not engineering, legal, or code-compliance advice. Results are estimates for qualified persons and must be verified against the NEC edition adopted where the work is done (your selected edition), manufacturer instructions, and the local AHJ. Use is subject to the Terms of Use & Disclaimer. — Morningstar Electric LLC