Branch-circuit and load-calculation notes for electric vehicle supply equipment (EVSE) under NEC Article 625, with a circuit-sizing table for common charger ratings. Verify the listing, the manufacturer’s instructions, and the adopted edition (2020 vs 2023 differences are flagged). Use the load calculator and this page together — this is not a substitute for a full Article 220 calculation.

⚠ Safety. EVSE is a continuous load. Size conductors and overcurrent protection before you energize. Lock out the feeder or branch circuit, verify dead, and follow the EVSE installation instructions for torque, conductor temperature rating, and indoor/outdoor listing.

1 · Continuous load — 125%

EVSE is a continuous load (625.41 / 625.42). Size branch-circuit conductors and the OCPD at 125% of the charger’s load current (also 210.19 and 215.2 / 210.20 as applicable). A 48 A charger requires a 60 A circuit (48 × 1.25 = 60). Many wall units are adjustable — if you set the unit down, size the circuit to the adjusted current the equipment is set and marked for, and follow 625.42 where a restricted adjustable setting is used.

2 · Circuit-sizing table (copper, 75°C terminals, 30°C, ≤3 CCC)

NM-B is limited to the 60°C column (334.80). 6 AWG NM-B is 55 A — it is not a 60 A conductor. A 48 A (60 A circuit) charger in NM-B needs 4 AWG, or run 6 AWG THHN/THWN-2 in a raceway at the 75°C column (65 A) if the terminals are 75°C-rated. Always apply adjustment and correction factors when they apply.

3 · GFCI requirements

4 · Load management / EVEMS — 625.42 and Article 750

Where a listed energy management system (EVEMS) or a restricted adjustable setting is used, 625.42 allows the calculated load to be the controlled maximum rather than the nameplate maximum, subject to the rules in 625.42 and the energy management requirements (2023 ties this more clearly to 750.30). The 2023 edition also splits load management and restricted adjustable settings into 625.42(A) and (B). If the EMS fails, the system must not leave the premises wiring overloaded — use listed equipment and follow its instructions.

2023 625.40: an individual branch circuit is required for EV charging outlets rated over 16 A or 120 V, with an exception when the load is managed so more than one charger can share a circuit. Check the exact text for the adopted edition.

5 · Load calculation tie-in (Article 220)

6 · Outdoor, receptacles, and disconnects

Reference only — not engineering, legal, or code-compliance advice. Results are estimates for qualified persons and must be verified against the NEC edition adopted where the work is done (your selected edition), manufacturer instructions, and the local AHJ. Use is subject to the Terms of Use & Disclaimer. — Morningstar Electric LLC